|
|
Research on overflow forecasting method of Chengbei Reservoir in Dinghai District,Zhoushan City based on two important typhoon processes in 2021 |
Qiu Jingyi, Zhu Dandan, Zhang Xin, Shao Sixue |
Dinghai Meteorological Bureau of Zhoushan,Zhoushan 316000 |
|
|
Abstract Based on the two important typhoon processes affecting Zhoushan in 2021,using the surface rainfall,the rainfall of Dinghai National Basic Meteorological Station and the rainfall of automatic meteorological station around Chengbei Reservoir as reservoir rainfall values,this paper analyzes the water storage capacity and overeflow capacity of Chengbei Reservoir.It is concluded that the two important typhoon processes affecting Zhoushan in 2021 have high research value.Taking the precipitation of Dinghai National Basic Meteorological Station as the main reference data has obvious practical application advantages.Every 1 mm precipitation can cause about 5 000 m3 of reservoir flood overflow/storage in Chengbei Reservoir.The prediction equations obtained from the study can provide a reference for the predicting factors such as overflow time and overflow volume of Chengbei Reservoir in Dinghai District.
|
Received: 04 May 2023
|
|
|
|
|
Cite this article: |
Qiu Jingyi,Zhu Dandan,Zhang Xin等. Research on overflow forecasting method of Chengbei Reservoir in Dinghai District,Zhoushan City based on two important typhoon processes in 2021[J]. Meteorological Hydrological and Marine Instrument, 2024, 41(2): 32-35.
|
|
|
|
URL: |
http://www.qxswhy.com/EN/ OR http://www.qxswhy.com/EN/Y2024/V41/I2/32 |
[1] |
李道宣,钟秀仁,程祖德.办好乡镇供水站发挥水利基础产业作用[J].水利经济,1991(4):17-19,13.
|
[2] |
叶兴永,朱晓曦.舟山市地下水资源开发利用和管理[J].浙江地质,1997(2):52-57.
|
[3] |
王忠玉,吴柏林.一类模糊数据的相关系数研究[J].经济研究导刊,2015(2):248-251.
|
[4] |
端义宏,高泉平,朱建荣.长江口区可能最高潮位估算研究[J].海洋学报(中文版),2004(5):45-54.
|
|
|
|