Abstract:By listing common mistakes of design and construction on integrated lightning protection in current network system,the mistake reasons and its hazards are comprehensively analyzed.According to these mistakes,specific corrective measuresare given out.This paper makes a detailed introduction for the principle that Kevin connection can reduce lightning induced voltage of protected equipment,whichplays a guiding role to improve the design and construction of similar projects.
崔金平,张春红. 网络系统防雷工程的常见问题分析[J]. 气象水文海洋仪器, 2013, 30(1): 91-93.
Cui Jinping,Zhang Chunhong. Common problems of lightning protection project in networksystem. Meteorological Hydrological and Marine Instrument, 2013, 30(1): 91-93.