Abstract Based on the principle of measuring sunshine duration by photoelectric digital sunshine recorder,the error of solar direct irradiation caused by un-horizontal installation,and misaligned of south-north line and latitude is analyzed in this paper.The direct irradiance ≥120 W/m-2 is used as the criterion for sunshine duration.Therefore,the error caused by improper installation affects the calculation of sunshine duration only when the direct irradiance is close to 120 W/m-2.
|
Received: 13 November 2019
|
|
|
|
|
[1] |
王连喜,李菁,李剑萍,等.气候变化对宁夏农业的影响综述[J].中国农业气象,2011,32(2):155-160,166.
|
[2] |
王向辉,雷玲.气候变化对农业可持续发展的影响及适应对策[J].云南师范大学学报(哲学社会科学版),2011,43(4):18-24.
|
[3] |
陈永川,贾海燕,高明.HYA-SF土壤水分自动监测站与土钻法测定士壤水分对比分析[J].山西气象,2008,21(1):43-44.
|
[4] |
王柏林,朱成欣,阳艳红.农田小气候自动气象观测系统[J].气象水文海洋仪器,2013,30(4):1-3,7.
|
|
|
|