|
|
Lightning transient analysis of wind turbine tower foundation based on ATP-EMTP |
Xie Xuanying1, Lin Yiping1, Liu Shufeng2, Wang Wenhao3 |
1. Xinfeng Meteorological Bureau of Guangdong,Xinfeng 511100; 2. Shaoguan Meteorological Bureau of Guangdong,Shaoguan 512000; 3. South China University of Technology,Guangzhou 510000 |
|
|
Abstract In order to solve the problem of lightning protection of wind turbine tower foundation,this paper uses ATP-EMTP software to simulate and analyze the transient voltage changes of the first lightning strike and subsequent return stroke at the lightning strike tower foundation.The results show that the transient voltage generated by the first lightning stroke and the subsequent return stroke reaches the peak value in a short time.Then,it attenuates in the form of damped oscillation.The time required reaching the peak voltage during the first lightning strike and subsequent return stroke is analyzed.Compared with the first lightning stroke,the transient voltage peak of the subsequent return stroke is lower,and the time required to reach the peak voltage is shorter.It is concluded that the problem of subsequent return stroke of lightning strike tower foundation cannot be ignored,and the lightning protection problem of tower foundation should be paid attention too.
|
Received: 24 May 2023
|
|
|
|
|
[1] |
林玉鑫,张京业.海上风电的发展现状与前景展望[J].分布式能源,2023,8(2):1-10.
|
[2] |
陈涛,邢金晶,刘闯,等.基于改进PSO-DE融合算法的风电场储能容量优化配置[J].山东电力技术,2023,50(1):8-13.
|
[3] |
谢辉,陈众,古纯松,等.基于多重雷击的风电机组集电线路雷电暂态过电压分析[J].电瓷避雷器,2022(4):43-51.
|
[4] |
周歧斌,王振兴,史一泽,等.敷设除冰碳纤维网的风机叶片雷击过电压防护[J].高压电器,2020,56(10):183-189.
|
[5] |
范昭胜.高山风电场雷击分析与接地整改防护[J].湖南电力,2020,40(4):63-67.
|
[6] |
姜龙杰,宋余来,元乙贺,等.风电场接地系统雷电冲击特性的研究[J].电瓷避雷器,2020(1):104-110.
|
[7] |
张萍,赵新贺,聂鑫鹏,等.基于ATP-EMTP的风电机组塔筒二次雷电回击暂态分析[J].高压电器,2023,59(5):163-169.
|
[8] |
唐力,李海明,高晋文,等.雷电流建模方法及其对架空线路耐雷性能分析影响的研究[J].电瓷避雷器,2015(2):37-43.
|
[9] |
陈炜炜,周懋坤,詹跃东,等.雷电流数学模型仿真及对比分析[J].电瓷避雷器,2019(6):7-12.
|
[10] |
唐王倩云,张睿,胡家兵.用于系统暂态行为分析的双馈风机转子转速控制时间尺度暂态模型[J].中国电机工程学报,2021,41(9):3037-3046.
|
|
|
|